Electricity (Exemption from Holding Licence) (Winch Energy Uganda SMC Limited) Order

Statutory Instrument 2 of 2020 Current version · as at 07 January 2020
Enacted2020
Commenced07 January 2020
Last amended
Point-in-time consolidation · as at 07 January 2020. This page may not reflect amendments made after that date. Confirm the current position against the latest Uganda Gazette before relying on it.

About this Act

A full descriptive summary for this Act has not been recorded yet.

Jurisdiction
Uganda
Type
Principal Legislation
Status
In force
Language
English

Full text of the Act

0 parts · 3 sections

Enhanced Annotated View adds approved, source-linked propositions, operative requirements, judicial passages, related provisions, amendment notes and authority status. Choose Original PDF to inspect the source consolidation.

Uganda

Electricity (Exemption from Holding Licence) (Winch Energy Uganda SMC Limited) Order

Commenced on 07 January 2020

[This is the version of this document at 07 January 2020.]

1. 'Title

This Order may be cited as the Electricity (Exemption from Holding Licence) (Winch Energy Uganda SMC Limited) Order, 2020.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “'Title”.

“This Order may be cited as the Electricity (Exemption from Holding Licence) (Winch Energy Uganda SMC Limited) Order, 2020.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. This Order may be cited as the Electricity (Exemption from Holding Licence) (Winch Energy Uganda SMC Limited) Order, 2020.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

2. Exemption

Winch Energy Uganda SMC Limited is exempted from the requirement to hold a licence under sections 51, 57 and 59 of the Electricity Act, 1999, for the generation, distribution or sale of electricity to promote rural electrification from a 120K W solar hybrid isolated grid system at Bujanko Island, Mpigi District.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Governing rule

This section states the governing statutory rule for “Exemption”.

“Winch Energy Uganda SMC Limited is exempted from the requirement to hold a licence under sections 51, 57 and 59 of the Electricity Act, 1999, for the generation, distribution or sale of electricity to promote rural electrification from a 120K W solar hybrid isolated grid system at Bujanko Island, Mpigi District.”
Primary legislation Source quotation matched
Practical effect

Use this section as the starting statutory rule for “Exemption”, together with the linked provisions and current consolidation.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

0

This section states a single governing proposition and does not enumerate separate elements.

Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions
Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

3. Duration

This Order shall lapse where the power plant referred to under paragraph 2 is interconnected to the main grid or where the power plant is upgraded to a capacity greater than two megawatts.

RICHARD S. APIRE, Chairperson Electricity Regulatory Authority.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Duration”.

“This Order shall lapse where the power plant referred to under paragraph 2 is interconnected to the main grid or where the power plant is upgraded to a capacity greater than two megawatts.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. This Order shall lapse where the power plant referred to under paragraph 2 is interconnected to the main grid or where the power plant is upgraded to a capacity greater than two megawatts.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Original Laws of Uganda consolidation (as at 07 January 2020) — public-domain legislation, consolidated by ULII / Laws.Africa (CC BY 4.0). This is a point-in-time text and may not reflect later amendments; confirm against the latest Uganda Gazette before relying on it.