Skip to content
Wakilii

National Climate Change (Climate Change Mechanisms) Regulations

Statutory Instrument 9 of 2025 Current version · as at 24 January 2025
Enacted2025
Commenced24 January 2025
Last amended
Point-in-time consolidation · as at 24 January 2025. This page may not reflect amendments made after that date. Confirm the current position against the latest Uganda Gazette before relying on it.

About this Act

A full descriptive summary for this Act has not been recorded yet.

Jurisdiction
Uganda
Type
Principal Legislation
Status
In force
Language
English

Full text of the Act

8 parts · 137 sections · 3 Schedules

Enhanced Annotated View adds approved, source-linked propositions, operative requirements, judicial passages, related provisions, amendment notes and authority status. Choose Original PDF to inspect the source consolidation.

Uganda

National Climate Change (Climate Change Mechanisms) Regulations

Commenced on 24 January 2025

[This is the version of this document at 24 January 2025.]

Part I

1. Citation

These Regulations may be cited as the National Climate Change (Climate Change Mechanisms) Regulations 2025.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Citation”.

“These Regulations may be cited as the National Climate Change (Climate Change Mechanisms) Regulations 2025.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. These Regulations may be cited as the National Climate Change (Climate Change Mechanisms) Regulations 2025.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
2. Interpretation

In these Regulations, unless the context otherwise requires- "Act" means the National Climate Change Act; "Agreement" means the Paris Agreement, 2015 set out in Schedule 4 to the Act; "certified emissions reduction units" means quantified greenhouse gas emission reduction or removal from the atmosphere arising from implementing a climate change mechanism project certified by the following Standards- (a) the United Nations Framework Convention on Climate Change Carbon Markets Certification Standards; (b) Gold Standard;

(c)

Verified Carbon Standard; (d) REDD+ Environmental Excellence Standard; or (e) Plan Vivo System; "climate change" means a change of climate which is attributed directly or indirectly to human activity that alters the composition of the global atmosphere and which is, in addition to natural climate variability, observed over comparable time periods; "climate change mechanism" means a mechanism to contribute to the mitigation of greenhouse gas emissions and support sustainable development and includes cooperative and non-market approaches as defined under article 6 of the Agreement; "Commissioner" means the commissioner responsible for the Department responsible for climate change in the Ministry; "currency point" has the value assigned to it in Schedule 1 to these Regulations; "Department" means the department responsible for climate change in the Ministry; "emissions" means the release of greenhouse gases or their precursors into the atmosphere over a specified area and period of time where the emissions are attributable to human activity; "emissions reduction units" means a tradable unit, that represents one ton, of verified quantified greenhouse gas emission reduction or removal from the atmosphere, arising from implementing a climate change mechanism project; "greenhouse gases" means those gaseous constituents of the atmosphere, both natural and anthropogenic, that absorb and re-emit infrared radiation;

"lead agency" means a Ministry, department, agency of Government or a local government responsible for undertaking response measures for climate change in accordance with the Act and the National Climate Change Policy; "Minister" means the Minister responsible for climate change matters; "Ministry" means the Ministry responsible for climate change matters; "mitigation" means efforts that seek to prevent or reduce the increase of atmospheric greenhouse gas concentrations by limiting current or future emissions and enhancing potential sinks for greenhouse gases; "project proponent" means an individual, a lead agency or private entity that applies to the Minister for approval to participate in a climate change mechanism referred to in section 8 of the Act; "targeted greenhouse gases" means carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), sulphur hexafluoride (SF6), Nitrogen Trifluoride (NF3) or any other greenhouse gas declared by the Minister in consultation with the Department, to be a targeted greenhouse gas.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Definition

This section supplies the definitions or statutory meaning governing “Interpretation”.

“In these Regulations, unless the context otherwise requires- "Act" means the National Climate Change Act; "Agreement" means the Paris Agreement, 2015 set out in Schedule 4 to the Act; "certified emissions reduction units" means quantified greenhouse gas emission reduction or removal from the atmosphere arising from implementing a climate change mechanism project certified by the following Standards- (a) the United Nations Framework Convention on Climate Change Carbon Markets Certification Standards; (b) Gold…”
Primary legislation Source quotation matched
Practical effect

Use this definition when interpreting other provisions that employ the language addressed by “Interpretation”.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. "lead agency" means a Ministry, department, agency of Government or a local government responsible for undertaking response measures for climate change in accordance with the Act and the National Climate Change Policy; "Minister" means the Minister responsible for climate change matters; "Ministry" means the Ministry responsible for climate change matters; "mitigation" means efforts that seek to prevent or reduce the increase of atmospheric greenhouse gas concentrations by limiting current or future emissions and enhancing potential sinks for greenhouse gases; "project proponent" means an individual, a lead agency or private entity that applies to the Minister for approval to participate in a climate change mechanism referred to in section 8 of the Act; "targeted greenhouse gases" means carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), sulphur hexafluoride (SF6), Nitrogen Trifluoride (NF3) or any other greenhouse gas declared by the Minister in consultation with the Department, to be a targeted greenhouse gas.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions
Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Part II

3. Measurement of emissions
(1)

Subject to section 9 of the Act, a lead agency shall measure the emissions of greenhouse gases in accordance with the Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories.

(2)

A project proponent who wishes to undertake a climate change mechanism project shall- (a) estimate the emissions or reductions of greenhouse gases; and (b) determine the net emissions reductions for the period in relation to the targeted greenhouse gas for that project in accordance with the greenhouse gas baseline in the project design document.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Measurement of emissions”.

“(1) Subject to section 9 of the Act, a lead agency shall measure the emissions of greenhouse gases in accordance with the Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) Subject to section 9 of the Act, a lead agency shall measure the emissions of greenhouse gases in accordance with the Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories.
  2. (2) A project proponent who wishes to undertake a climate change mechanism project shall- (a) estimate the emissions or reductions of greenhouse gases; and (b) determine the net emissions reductions for the period in relation to the targeted greenhouse gas for that project in accordance with the greenhouse gas baseline in the project design document.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions
Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Part III

4. Registration of verifiers
(1)

Subject to section 12 of the Act, a person who intends to conduct validation or verification of emissions reduction units in Uganda shall apply to the Commissioner to be registered as a verifier in Form 1 set out in Schedule 2 to these Regulations.

(2)

An application referred to in subregulation (1) shall be accompanied by- (a) proof of accreditation in accordance with any of the following standards- (i) the United Nations Framework Convention on Climate Change Carbon Markets Certification Standards; (ii) Gold Standard; (iii) Verified Carbon Standard; (iv) REDD+ Environmental Excellence Standard; or (v) Plan Vivo System; and

(b)

evidence of proof of payment of the registration fees for a verifier prescribed in Schedule 3 to these Regulations.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Registration of verifiers”.

“(1) Subject to section 12 of the Act, a person who intends to conduct validation or verification of emissions reduction units in Uganda shall apply to the Commissioner to be registered as a verifier in Form 1 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (1) Subject to section 12 of the Act, a person who intends to conduct validation or verification of emissions reduction units in Uganda shall apply to the Commissioner to be registered as a verifier in Form 1 set out in Schedule 2 to these Regulations.
  2. (2) An application referred to in subregulation (1) shall be accompanied by- (a) proof of accreditation in accordance with any of the following standards- (i) the United Nations Framework Convention on Climate Change Carbon Markets Certification Standards; (ii) Gold Standard; (iii) Verified Carbon Standard; (iv) REDD+ Environmental Excellence Standard; or (v) Plan Vivo System; and
  3. (b) evidence of proof of payment of the registration fees for a verifier prescribed in Schedule 3 to these Regulations.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions
Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
5. Certificate of registration of verifier
(1)

The Commissioner shall consider the application submitted in regulation 4 within twenty-one working days of receipt and issue the applicant with a certificate of registration in Form 2 set out in Schedule 2 to these Regulations.

(2)

The Commissioner shall, upon issuing a certificate of registration of verifier, enter the details of the verifier on the register referred to in regulation 41.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Certificate of registration of verifier”.

“(1) The Commissioner shall consider the application submitted in regulation 4 within twenty-one working days of receipt and issue the applicant with a certificate of registration in Form 2 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) The Commissioner shall consider the application submitted in regulation 4 within twenty-one working days of receipt and issue the applicant with a certificate of registration in Form 2 set out in Schedule 2 to these Regulations.
  2. (2) The Commissioner shall, upon issuing a certificate of registration of verifier, enter the details of the verifier on the register referred to in regulation 41.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
6. Validity of certificate of registration of verifier

A certificate of registration of a verifier issued under these Regulations shall be valid for the period specified in the proof of accreditation referred to in regulation 4(2) (a).

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Validity of certificate of registration of verifier”.

“A certificate of registration of a verifier issued under these Regulations shall be valid for the period specified in the proof of accreditation referred to in regulation 4(2) (a).”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. A certificate of registration of a verifier issued under these Regulations shall be valid for the period specified in the proof of accreditation referred to in regulation 4(2) (a).
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
7. Revocation of certificate of registration of verifier
(1)

The Commissioner may revoke a certificate of registration of a verifier where-

(a)

the verifier violates any law of Uganda;

(b)

the verifier obtained the certificate of registration by misrepresentation of material information; or

(c)

the accreditation of the verifier under the standards referred to in regulation 4 (2)(a) has been revoked.

(2)

The Commissioner shall give the holder of a certificate of registration notice, stating the reasons in writing for the revocation or suspension of the certificate of registration.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Revocation of certificate of registration of verifier”.

“(1) The Commissioner may revoke a certificate of registration of a verifier where-”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

5
  1. (1) The Commissioner may revoke a certificate of registration of a verifier where-
  2. (a) the verifier violates any law of Uganda;
  3. (b) the verifier obtained the certificate of registration by misrepresentation of material information; or
  4. (c) the accreditation of the verifier under the standards referred to in regulation 4 (2)(a) has been revoked.
  5. (2) The Commissioner shall give the holder of a certificate of registration notice, stating the reasons in writing for the revocation or suspension of the certificate of registration.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
8. Renewal of certificate of registration of verifier

A verifier seeking to renew a certificate of registration shall apply to the Commissioner in Form 1 set out in Schedule 2 to these Regulations.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Renewal of certificate of registration of verifier”.

“A verifier seeking to renew a certificate of registration shall apply to the Commissioner in Form 1 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. A verifier seeking to renew a certificate of registration shall apply to the Commissioner in Form 1 set out in Schedule 2 to these Regulations.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Part IV

9. Request to participate in climate change mechanisms
(1)

A project proponent who wishes to participate in a climate change mechanism shall, before commencing the climate change mechanism project, submit to the Minister a request in Form 3 set out in Schedule 2 to these Regulations.

(2)

The request referred to in subregulation (1) shall state - (a) the name and contact details of the applicant;

(b)

the legal nature of the applicant;

(c)

the geographical location of the proposed project for the climate change mechanism, indicating the coordinates, where applicable; and

(d)

any other information as may be required by the Minister.

(3)

The request referred to in subregulation (1) shall be accompanied by- (a) a project idea note in the form set out in Form 4 of Schedule 2 to these Regulations; and (b) proof of registration of the project proponent in Uganda.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Request to participate in climate change mechanisms”.

“(1) A project proponent who wishes to participate in a climate change mechanism shall, before commencing the climate change mechanism project, submit to the Minister a request in Form 3 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

6
  1. (1) A project proponent who wishes to participate in a climate change mechanism shall, before commencing the climate change mechanism project, submit to the Minister a request in Form 3 set out in Schedule 2 to these Regulations.
  2. (2) The request referred to in subregulation (1) shall state - (a) the name and contact details of the applicant;
  3. (b) the legal nature of the applicant;
  4. (c) the geographical location of the proposed project for the climate change mechanism, indicating the coordinates, where applicable; and
  5. (d) any other information as may be required by the Minister.
  6. (3) The request referred to in subregulation (1) shall be accompanied by- (a) a project idea note in the form set out in Form 4 of Schedule 2 to these Regulations; and (b) proof of registration of the project proponent in Uganda.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
10. Consideration of request to participate in climate change

mechanisms (1) The Minister shall consider a request to participate in a climate change mechanism within twenty-one working days from the date of receipt of the request.

(2)

Where the Minister requests for additional information under regulation 9 (2) (d), the project proponent shall submit the information within seven working days.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Consideration of request to participate in climate change”.

“mechanisms (1) The Minister shall consider a request to participate in a climate change mechanism within twenty-one working days from the date of receipt of the request.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. (2) Where the Minister requests for additional information under regulation 9 (2) (d), the project proponent shall submit the information within seven working days.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
11. Grant of letter of no objection
(1)

The Minister may, upon being satisfied with a request to participate in a climate change mechanism, grant a letter of no objection to a project proponent in Form 5 set out in Schedule 2 to these Regulations.

(2)

The letter of no objection shall permit the project proponent to carry out feasibility studies on the proposed climate change mechanism project.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Grant of letter of no objection”.

“(1) The Minister may, upon being satisfied with a request to participate in a climate change mechanism, grant a letter of no objection to a project proponent in Form 5 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) The Minister may, upon being satisfied with a request to participate in a climate change mechanism, grant a letter of no objection to a project proponent in Form 5 set out in Schedule 2 to these Regulations.
  2. (2) The letter of no objection shall permit the project proponent to carry out feasibility studies on the proposed climate change mechanism project.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
12. Refusal to grant letter of no objection

Where the Minister refuses to grant a letter of no objection, he or she shall inform the applicant in writing, stating the reasons for the refusal

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Refusal to grant letter of no objection”.

“Where the Minister refuses to grant a letter of no objection, he or she shall inform the applicant in writing, stating the reasons for the refusal”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. Where the Minister refuses to grant a letter of no objection, he or she shall inform the applicant in writing, stating the reasons for the refusal
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
13. Validity of letter of no objection A letter of no objection issued under

these Regulations is valid for a period of twenty-four months from the date of issue

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Governing rule

This section states the governing statutory rule for “Validity of letter of no objection A letter of no objection issued under”.

“these Regulations is valid for a period of twenty-four months from the date of issue”
Primary legislation Source quotation matched
Practical effect

Use this section as the starting statutory rule for “Validity of letter of no objection A letter of no objection issued under”, together with the linked provisions and current consolidation.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

0

This section states a single governing proposition and does not enumerate separate elements.

Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
14. Cancellation of letter of no objection

The Minister may cancel a letter of no objection where a project proponent (a) submitted false information under regulation 9; or (b) uses the letter of no objection for purposes other than the carrying out of feasibility studies.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Cancellation of letter of no objection”.

“The Minister may cancel a letter of no objection where a project proponent (a) submitted false information under regulation 9; or (b) uses the letter of no objection for purposes other than the carrying out of feasibility studies.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. The Minister may cancel a letter of no objection where a project proponent (a) submitted false information under regulation 9; or (b) uses the letter of no objection for purposes other than the carrying out of feasibility studies.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
15. Progress report
(1)

A project proponent issued with a letter of no objection shall, every six months, submit to the Minister a report of activities that the project proponent has initiated, carried out or completed in Form 6 set out in Schedule 2 to these Regulations.

(2)

A project proponent who fails to comply with subregulation (1) commits an offence and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years, or both; or

(b)

in the case of an entity, to a fine not exceeding five hundred currency points.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Offence or consequence

This section creates or governs statutory liability concerning “Progress report”.

“(1) A project proponent issued with a letter of no objection shall, every six months, submit to the Minister a report of activities that the project proponent has initiated, carried out or completed in Form 6 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

A party alleging or defending liability should test the facts and prescribed consequence against each operative requirement.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (1) A project proponent issued with a letter of no objection shall, every six months, submit to the Minister a report of activities that the project proponent has initiated, carried out or completed in Form 6 set out in Schedule 2 to these Regulations.
  2. (2) A project proponent who fails to comply with subregulation (1) commits an offence and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years, or both; or
  3. (b) in the case of an entity, to a fine not exceeding five hundred currency points.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
16. Extension of letter of no objection
(1)

A project proponent who has commenced activities and has complied with the reporting obligations under regulation 15 may apply for extension of the validity of the letter of no objection, stating the reasons for the extension.

(2)

An application referred to in subsection (1) shall be submitted to the Minister at least 3 months before the expiry of the letter of no objection.

(3)

Where the Minister is satisfied with the reasons for seeking an extension of validity of a letter of no objection, he or she shall grant an extension.

(4)

Notwithstanding subregulation (3), the extension of a letter of no objection shall not- (a) exceed twenty-four months at a time; and (b) be granted more than twice.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Extension of letter of no objection”.

“(1) A project proponent who has commenced activities and has complied with the reporting obligations under regulation 15 may apply for extension of the validity of the letter of no objection, stating the reasons for the extension.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

4
  1. (1) A project proponent who has commenced activities and has complied with the reporting obligations under regulation 15 may apply for extension of the validity of the letter of no objection, stating the reasons for the extension.
  2. (2) An application referred to in subsection (1) shall be submitted to the Minister at least 3 months before the expiry of the letter of no objection.
  3. (3) Where the Minister is satisfied with the reasons for seeking an extension of validity of a letter of no objection, he or she shall grant an extension.
  4. (4) Notwithstanding subregulation (3), the extension of a letter of no objection shall not- (a) exceed twenty-four months at a time; and (b) be granted more than twice.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
17. Application for approval of climate change mechanism
(1)

A project proponent shall, during the period of validity of the letter of no objection, apply for approval of a climate change mechanism project in Form 7 set out in Schedule 2 to these Regulations.

(2)

An application for approval of a climate change mechanism project shall be accompanied by- (a) a project design document in accordance with Form 8 set out in Schedule 2 to these Regulations; (b) a feasibility study or business plan; and (c) a letter of recommendation from the relevant lead agency.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Scope rule

This section defines when and how “Application for approval of climate change mechanism” applies.

“(1) A project proponent shall, during the period of validity of the letter of no objection, apply for approval of a climate change mechanism project in Form 7 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

Confirm that the matter and forum fall within this section before applying the Act's remaining provisions.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A project proponent shall, during the period of validity of the letter of no objection, apply for approval of a climate change mechanism project in Form 7 set out in Schedule 2 to these Regulations.
  2. (2) An application for approval of a climate change mechanism project shall be accompanied by- (a) a project design document in accordance with Form 8 set out in Schedule 2 to these Regulations; (b) a feasibility study or business plan; and (c) a letter of recommendation from the relevant lead agency.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
18. Benefit sharing Plan
(1)

A project proponent shall submit a benefit sharing plan in Form 9 set out in Schedule 2 to these Regulations, together with the application for approval of a climate change mechanism project.

(2)

The benefit sharing plan shall demonstrate equity, fairness, engagement and consultation of beneficiaries and other interested groups.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Benefit sharing Plan”.

“(1) A project proponent shall submit a benefit sharing plan in Form 9 set out in Schedule 2 to these Regulations, together with the application for approval of a climate change mechanism project.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A project proponent shall submit a benefit sharing plan in Form 9 set out in Schedule 2 to these Regulations, together with the application for approval of a climate change mechanism project.
  2. (2) The benefit sharing plan shall demonstrate equity, fairness, engagement and consultation of beneficiaries and other interested groups.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
19. Consideration of application for approval of climate change

mechanism project (1) The Minister shall, upon receipt of an application for approval of a climate change mechanism project, consider the application within twenty-one working days from receipt.

(2)

The Minister, in considering the application, shall take into account the sustainable development criteria prescribed in Form 10 set out in Schedule 2 to these Regulations.

(3)

Where the Minister is of the view that the application for approval of a climate change mechanism requires further information, the Minister shall, in writing, inform the person of the areas that require additional information.

(4)

The project proponent shall provide the additional information required within fourteen working days from the date on which the request for further information is made.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Scope rule

This section defines when and how “Consideration of application for approval of climate change” applies.

“mechanism project (1) The Minister shall, upon receipt of an application for approval of a climate change mechanism project, consider the application within twenty-one working days from receipt.”
Primary legislation Source quotation matched
Practical effect

Confirm that the matter and forum fall within this section before applying the Act's remaining provisions.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (2) The Minister, in considering the application, shall take into account the sustainable development criteria prescribed in Form 10 set out in Schedule 2 to these Regulations.
  2. (3) Where the Minister is of the view that the application for approval of a climate change mechanism requires further information, the Minister shall, in writing, inform the person of the areas that require additional information.
  3. (4) The project proponent shall provide the additional information required within fourteen working days from the date on which the request for further information is made.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
20. Grant of approval
(1)

Where the Minister is satisfied with the application for approval of a climate change mechanism, he or she may issue an approval of climate change mechanisms project in Form 11 set out in Schedule 2 to these Regulations.

(2)

The Minister may impose conditions as he or she may deem necessary on an approval of a climate change mechanism.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Grant of approval”.

“(1) Where the Minister is satisfied with the application for approval of a climate change mechanism, he or she may issue an approval of climate change mechanisms project in Form 11 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) Where the Minister is satisfied with the application for approval of a climate change mechanism, he or she may issue an approval of climate change mechanisms project in Form 11 set out in Schedule 2 to these Regulations.
  2. (2) The Minister may impose conditions as he or she may deem necessary on an approval of a climate change mechanism.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
21. Refusal to grant approval
(1)

Where the Minister refuses to grant approval for a climate change mechanism project, he or she shall inform the person in writing, stating the reasons for the refusal.

(2)

Notwithstanding subregulation (1), a project proponent may reapply for approval of a climate change mechanism project.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Refusal to grant approval”.

“(1) Where the Minister refuses to grant approval for a climate change mechanism project, he or she shall inform the person in writing, stating the reasons for the refusal.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) Where the Minister refuses to grant approval for a climate change mechanism project, he or she shall inform the person in writing, stating the reasons for the refusal.
  2. (2) Notwithstanding subregulation (1), a project proponent may reapply for approval of a climate change mechanism project.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
22. Validity of approval The approval for

a climate change mechanism project granted under regulation 19 shall be valid for the crediting period of the climate change mechanism

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Validity of approval The approval for”.

“a climate change mechanism project granted under regulation 19 shall be valid for the crediting period of the climate change mechanism”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. a climate change mechanism project granted under regulation 19 shall be valid for the crediting period of the climate change mechanism
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
23. Commencement of climate change mechanism project
(1)

A project proponent shall, within twelve months after receiving an approval for a climate change mechanism project, commence the implementation of the climate change mechanism activities.

(2)

The project proponent shall, within six months of commencing of the climate change mechanism project, notify the Minister in writing of the commencement of the project.

(3)

Where a project proponent has not commenced the implementation of the climate change mechanism activities within twelve months, the Minister shall cancel the approval of the climate change mechanism project.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Commencement of climate change mechanism project”.

“(1) A project proponent shall, within twelve months after receiving an approval for a climate change mechanism project, commence the implementation of the climate change mechanism activities.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (1) A project proponent shall, within twelve months after receiving an approval for a climate change mechanism project, commence the implementation of the climate change mechanism activities.
  2. (2) The project proponent shall, within six months of commencing of the climate change mechanism project, notify the Minister in writing of the commencement of the project.
  3. (3) Where a project proponent has not commenced the implementation of the climate change mechanism activities within twelve months, the Minister shall cancel the approval of the climate change mechanism project.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
24. Progress report of implementation of climate change

mechanism (1) A project proponent shall submit a progress report on the project to the Commissioner in accordance with the reporting cycle specified in the project design document.

(2)

The report referred to in subregulation (1) shall be in Form 12 set out in Schedule 2 to these Regulations.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Progress report of implementation of climate change”.

“mechanism (1) A project proponent shall submit a progress report on the project to the Commissioner in accordance with the reporting cycle specified in the project design document.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. (2) The report referred to in subregulation (1) shall be in Form 12 set out in Schedule 2 to these Regulations.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
25. Monitoring report on project emissions reduction
(1)

A project proponent shall, during the course of the climate change mechanism project, prepare a monitoring report on the project emissions reduction in relation to baseline emissions in accordance with the project design document.

(2)

The project proponent shall submit the monitoring report on the project emissions reduction to the Minister once in each year.

(3)

A project proponent who contravenes this regulation commits an offence, and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or imprisonment for a period not exceeding two years or both; or

(b)

in the case of an entity, to a fine not exceeding five hundred currency points.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Offence or consequence

This section creates or governs statutory liability concerning “Monitoring report on project emissions reduction”.

“(1) A project proponent shall, during the course of the climate change mechanism project, prepare a monitoring report on the project emissions reduction in relation to baseline emissions in accordance with the project design document.”
Primary legislation Source quotation matched
Practical effect

A party alleging or defending liability should test the facts and prescribed consequence against each operative requirement.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

4
  1. (1) A project proponent shall, during the course of the climate change mechanism project, prepare a monitoring report on the project emissions reduction in relation to baseline emissions in accordance with the project design document.
  2. (2) The project proponent shall submit the monitoring report on the project emissions reduction to the Minister once in each year.
  3. (3) A project proponent who contravenes this regulation commits an offence, and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or imprisonment for a period not exceeding two years or both; or
  4. (b) in the case of an entity, to a fine not exceeding five hundred currency points.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
26. Cessation of climate change mechanism project
(1)

A project proponent who wishes to cease carrying out a climate change mechanism project shall notify the Minister within thirty working days before the intended date of cessation of the climate change mechanism project.

(2)

The notice of cessation shall be in Form 13 set out in Schedule 2 to these Regulations.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Cessation of climate change mechanism project”.

“(1) A project proponent who wishes to cease carrying out a climate change mechanism project shall notify the Minister within thirty working days before the intended date of cessation of the climate change mechanism project.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A project proponent who wishes to cease carrying out a climate change mechanism project shall notify the Minister within thirty working days before the intended date of cessation of the climate change mechanism project.
  2. (2) The notice of cessation shall be in Form 13 set out in Schedule 2 to these Regulations.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
27. Cancellation of approval

The Minister may cancel the approval for a climate change mechanism project for the following reasons (a) failure to commence the project activities within twelve months; (b) non-compliance with the conditions of the approval; (c) obtaining approval through misrepresentation or fraud;

(d)

where it is necessary to protect human health or to prevent harm or further harm to the environment, cultural resources or affected communities due to a situation that was not foreseen;

(e)

continued implementation of the project activities is overridden by other public interests; or

(f)

where information is brought to the attention of the Minister which could have precluded the approval, had it been made available prior to the issuance of the letter of approval.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Cancellation of approval”.

“The Minister may cancel the approval for a climate change mechanism project for the following reasons (a) failure to commence the project activities within twelve months; (b) non-compliance with the conditions of the approval; (c) obtaining approval through misrepresentation or fraud;”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (d) where it is necessary to protect human health or to prevent harm or further harm to the environment, cultural resources or affected communities due to a situation that was not foreseen;
  2. (e) continued implementation of the project activities is overridden by other public interests; or
  3. (f) where information is brought to the attention of the Minister which could have precluded the approval, had it been made available prior to the issuance of the letter of approval.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
28. Transfer of approval An approval for a climate change mechanism project issued under

these Regulations shall not be transferable

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Transfer of approval An approval for a climate change mechanism project issued under”.

“these Regulations shall not be transferable”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. these Regulations shall not be transferable
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
29. Validation of climate change mechanism
(1)

A project proponent of a climate change mechanism project shall, upon receipt of the approval for a climate change mechanism under regulation 19, submit the documents relating to the climate change mechanisms project to a registered verifier for validation.

(2)

The project proponent shall submit the validation report to the Minister in accordance with the approved project design document.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Validation of climate change mechanism”.

“(1) A project proponent of a climate change mechanism project shall, upon receipt of the approval for a climate change mechanism under regulation 19, submit the documents relating to the climate change mechanisms project to a registered verifier for validation.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A project proponent of a climate change mechanism project shall, upon receipt of the approval for a climate change mechanism under regulation 19, submit the documents relating to the climate change mechanisms project to a registered verifier for validation.
  2. (2) The project proponent shall submit the validation report to the Minister in accordance with the approved project design document.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
30. Verification of climate change mechanism project
(1)

A project proponent shall submit to a registered verifier the monitoring report, referred to in regulation 24, for verification.

(2)

Upon receipt of a verification report from the registered verifier, the project proponent shall submit a copy of the monitoring report and verification report to the Minister.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Verification of climate change mechanism project”.

“(1) A project proponent shall submit to a registered verifier the monitoring report, referred to in regulation 24, for verification.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A project proponent shall submit to a registered verifier the monitoring report, referred to in regulation 24, for verification.
  2. (2) Upon receipt of a verification report from the registered verifier, the project proponent shall submit a copy of the monitoring report and verification report to the Minister.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
31. Issue of certified emissions reduction units
(1)

A registered verifier shall, on behalf of a project proponent, apply to the standards referred to in the project design document for issuance of the certified emissions reduction units.

(2)

The standard to which the verification report is submitted shall issue the project proponent with a certificate of certified emissions reduction units.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Issue of certified emissions reduction units”.

“(1) A registered verifier shall, on behalf of a project proponent, apply to the standards referred to in the project design document for issuance of the certified emissions reduction units.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A registered verifier shall, on behalf of a project proponent, apply to the standards referred to in the project design document for issuance of the certified emissions reduction units.
  2. (2) The standard to which the verification report is submitted shall issue the project proponent with a certificate of certified emissions reduction units.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
32. Registration of certified emissions reduction units

The project proponent shall, upon receipt of the certificate of certified emissions reduction units referred to in regulation 31, lodge the certificate with the Ministry for purposes of entry into the register

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Registration of certified emissions reduction units”.

“The project proponent shall, upon receipt of the certificate of certified emissions reduction units referred to in regulation 31, lodge the certificate with the Ministry for purposes of entry into the register”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. The project proponent shall, upon receipt of the certificate of certified emissions reduction units referred to in regulation 31, lodge the certificate with the Ministry for purposes of entry into the register
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
33. Use of certified emissions reduction units

The project proponent shall use the certified emissions reduction units for the purpose stated in the project design document referred to in regulation 17 and for the approval of a climate change mechanism

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Use of certified emissions reduction units”.

“The project proponent shall use the certified emissions reduction units for the purpose stated in the project design document referred to in regulation 17 and for the approval of a climate change mechanism”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. The project proponent shall use the certified emissions reduction units for the purpose stated in the project design document referred to in regulation 17 and for the approval of a climate change mechanism
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
34. Ownership of emissions reduction units
(1)

A person who owns- (a) a source of emissions reduction units; or (b) emissions reduction mitigation technology, shall be deemed to be the owner of the emissions reduction units.

(2)

Where the person owns the source of emissions reduction units but does not own the emissions reduction mitigation technology, the ownership of the emission reduction units shall be stipulated in the benefit sharing plan referred to in regulation 18.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Ownership of emissions reduction units”.

“(1) A person who owns- (a) a source of emissions reduction units; or (b) emissions reduction mitigation technology, shall be deemed to be the owner of the emissions reduction units.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A person who owns- (a) a source of emissions reduction units; or (b) emissions reduction mitigation technology, shall be deemed to be the owner of the emissions reduction units.
  2. (2) Where the person owns the source of emissions reduction units but does not own the emissions reduction mitigation technology, the ownership of the emission reduction units shall be stipulated in the benefit sharing plan referred to in regulation 18.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Part V

35. Notification of transfer of certified emissions

reduction units (1) A project proponent who wishes to transfer certified emissions reduction units shall within thirty working days before the transfer, notify the Minister in writing- (a) stating whether the transfer is a domestic or international transaction; (b) attaching proof of registration of the certified emission reductions; (c) indicating the particulars of the person or country to whom the transfer is being made; (d) stating the intended use of the verified emissions reduction units by the transferee; and (e) indicating the amount of verified emissions reduction units being transferred.

(2)

A project proponent who contravenes this regulation commits an offence and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years or both; or (b) in the case of an entity, to a fine not exceeding five hundred currency points.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Offence or consequence

This section creates or governs statutory liability concerning “Notification of transfer of certified emissions”.

“reduction units (1) A project proponent who wishes to transfer certified emissions reduction units shall within thirty working days before the transfer, notify the Minister in writing- (a) stating whether the transfer is a domestic or international transaction; (b) attaching proof of registration of the certified emission reductions; (c) indicating the particulars of the person or country to whom the transfer is being made; (d) stating the intended use of the verified emissions reduction units by the transferee;…”
Primary legislation Source quotation matched
Practical effect

A party alleging or defending liability should test the facts and prescribed consequence against each operative requirement.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. (2) A project proponent who contravenes this regulation commits an offence and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years or both; or (b) in the case of an entity, to a fine not exceeding five hundred currency points.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
36. Authorisation of domestic transfer of certified emissions

reduction units (1) A project proponent who transfers certified emissions reduction units to another person within Uganda shall, within fourteen working days of the transfer, submit a report to the Minister in Form 14 set out in Schedule 2 to these Regulations.

(2)

A project proponent who contravenes this regulation commits an offence, and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years or both; or (b) in the case of an entity, to a fine not exceeding five hundred currency points.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Offence or consequence

This section creates or governs statutory liability concerning “Authorisation of domestic transfer of certified emissions”.

“reduction units (1) A project proponent who transfers certified emissions reduction units to another person within Uganda shall, within fourteen working days of the transfer, submit a report to the Minister in Form 14 set out in Schedule 2 to these Regulations.”
Primary legislation Source quotation matched
Practical effect

A party alleging or defending liability should test the facts and prescribed consequence against each operative requirement.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. (2) A project proponent who contravenes this regulation commits an offence, and is liable, on conviction- (a) in the case of an individual, to a fine not exceeding five hundred currency points or a term of imprisonment not exceeding two years or both; or (b) in the case of an entity, to a fine not exceeding five hundred currency points.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
37. Authorisation of international transfer of verified

emissions reduction units (1) A project proponent who wishes to carry out an international transfer of verified emissions reduction units shall apply for authorisation from the Minister in Form 15 set out in Schedule 2 to these Regulations. (2) The application referred to in subregulation (1) shall state- (a) proof of ownership of the emissions reduction units; (b) proof of registration of the verified emissions reduction units; (c) the particulars of the person or country to whom the transfer is being made; (d) the intended use of the verified emissions reduction units of the transferee; (e) the amount of verified emissions reduction units being transferred; and (f) evidence of payment of the prescribed fee. (3) The Minister shall consider the application within thirty working days from the date of receipt. (4) Where the Minister is satisfied with the information in the application he or she shall issue a letter of authorisation in Form 16 set out in Schedule 2 to these Regulations.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Authorisation of international transfer of verified”.

“emissions reduction units (1) A project proponent who wishes to carry out an international transfer of verified emissions reduction units shall apply for authorisation from the Minister in Form 15 set out in Schedule 2 to these Regulations. (2) The application referred to in subregulation (1) shall state- (a) proof of ownership of the emissions reduction units; (b) proof of registration of the verified emissions reduction units; (c) the particulars of the person or country to whom the transfer is being made; (d)…”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. emissions reduction units (1) A project proponent who wishes to carry out an international transfer of verified emissions reduction units shall apply for authorisation from the Minister in Form 15 set out in Schedule 2 to these Regulations. (2) The application referred to in subregulation (1) shall state- (a) proof of ownership of the emissions reduction units; (b) proof of registration of the verified emissions reduction units; (c) the particulars of the person or country to whom the transfer is being made; (d) the intended use of the verified emissions reduction units of the transferee; (e) the amount of verified emissions reduction units being transferred; and (f) evidence of payment of the prescribed fee. (3) The Minister shall consider the application within thirty working days from the date of receipt. (4) Where the Minister is satisfied with the information in the application he or she shall issue a letter of authorisation in Form 16 set out in Schedule 2 to these Regulations.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
38. Validity of authorisation An authorisation granted

under regulation 35 shall be valid only for the transfer for which it was sought

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Validity of authorisation An authorisation granted”.

“under regulation 35 shall be valid only for the transfer for which it was sought”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. under regulation 35 shall be valid only for the transfer for which it was sought
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
39. Cancellation of authorisation

The Minister may cancel an authorisation before the use of the verified emissions reduction units where (a) the holder of the authorisation contravenes any provision of the Act; (b) the holder of the authorisation fails to comply with the conditions stipulated under the Authorisation; (c) the Minister considers it to be in the interest of the environment or in the public interest to cancel the Authorisation; or (d) the holder submitted false information or misrepresentation in the application.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Cancellation of authorisation”.

“The Minister may cancel an authorisation before the use of the verified emissions reduction units where (a) the holder of the authorisation contravenes any provision of the Act; (b) the holder of the authorisation fails to comply with the conditions stipulated under the Authorisation; (c) the Minister considers it to be in the interest of the environment or in the public interest to cancel the Authorisation; or (d) the holder submitted false information or misrepresentation in the application.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. The Minister may cancel an authorisation before the use of the verified emissions reduction units where (a) the holder of the authorisation contravenes any provision of the Act; (b) the holder of the authorisation fails to comply with the conditions stipulated under the Authorisation; (c) the Minister considers it to be in the interest of the environment or in the public interest to cancel the Authorisation; or (d) the holder submitted false information or misrepresentation in the application.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
40. Corresponding adjustment fee Emissions reduction units that are transferred internationally

for the purpose of meeting National Determined Contributions commitments of another country and other international mitigation purposes, including Carbon Offsetting and Reduction Schemes for International Aviation shall attract a corresponding adjustment fee specified in Schedule 3 to these Regulations

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Corresponding adjustment fee Emissions reduction units that are transferred internationally”.

“for the purpose of meeting National Determined Contributions commitments of another country and other international mitigation purposes, including Carbon Offsetting and Reduction Schemes for International Aviation shall attract a corresponding adjustment fee specified in Schedule 3 to these Regulations”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. for the purpose of meeting National Determined Contributions commitments of another country and other international mitigation purposes, including Carbon Offsetting and Reduction Schemes for International Aviation shall attract a corresponding adjustment fee specified in Schedule 3 to these Regulations
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history

Part VI

41. Register of climate change mechanism project
(1)

The Department shall keep and maintain a register of climate change mechanism projects approved by the Minister.

(2)

The Department shall indicate against every climate change mechanism project - (a) the name of the project;

(b)

the physical location of the project; (c) the details of the project proponent; (d) registration of mitigation activities and voluntary carbon market projects; (e) carbon market project activities; (f) data for the greenhouse gas accounting of the National Determined Contributions of Uganda and for international reporting; and (g) information on transfers and retirements of all emissions reduction units.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Register of climate change mechanism project”.

“(1) The Department shall keep and maintain a register of climate change mechanism projects approved by the Minister.”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

3
  1. (1) The Department shall keep and maintain a register of climate change mechanism projects approved by the Minister.
  2. (2) The Department shall indicate against every climate change mechanism project - (a) the name of the project;
  3. (b) the physical location of the project; (c) the details of the project proponent; (d) registration of mitigation activities and voluntary carbon market projects; (e) carbon market project activities; (f) data for the greenhouse gas accounting of the National Determined Contributions of Uganda and for international reporting; and (g) information on transfers and retirements of all emissions reduction units.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
42. Changes to climate change mechanism project

A project proponent shall, before making any planned changes to a climate change mechanism project, notify the Minister in Form 17 set out in schedule 2 to these Regulations of the intended change, not less than sixty working days before the effective date of the change

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Changes to climate change mechanism project”.

“A project proponent shall, before making any planned changes to a climate change mechanism project, notify the Minister in Form 17 set out in schedule 2 to these Regulations of the intended change, not less than sixty working days before the effective date of the change”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. A project proponent shall, before making any planned changes to a climate change mechanism project, notify the Minister in Form 17 set out in schedule 2 to these Regulations of the intended change, not less than sixty working days before the effective date of the change
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
43. Access to register

Every person shall have a right to access any information in the register, subject to the Constitution and the Access to Information Act

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Access to register”.

“Every person shall have a right to access any information in the register, subject to the Constitution and the Access to Information Act”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. Every person shall have a right to access any information in the register, subject to the Constitution and the Access to Information Act
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions
Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
44. Appeals
(1)

A person aggrieved by a decision of the Minister made under these Regulations may appeal to the High Court within thirty days of receipt of the decision.

(2)

A person aggrieved by a decision of the Commissioner made under these Regulations may appeal in writing to the Minister within thirty days of receipt of the decision.

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Statutory power

This section confers or regulates the statutory power described as “Appeals”.

“(1) A person aggrieved by a decision of the Minister made under these Regulations may appeal to the High Court within thirty days of receipt of the decision.”
Primary legislation Source quotation matched
Practical effect

The power must be exercised by the authorised decision-maker, within the conditions and purpose stated in the section.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

2
  1. (1) A person aggrieved by a decision of the Minister made under these Regulations may appeal to the High Court within thirty days of receipt of the decision.
  2. (2) A person aggrieved by a decision of the Commissioner made under these Regulations may appeal in writing to the Minister within thirty days of receipt of the decision.
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
45. Transition of climate change mechanism project A climate change mechanism approval granted before the commencement of

these Regulations shall remain valid until the 31st day of December, SCHEDULE 1 Regulation 2

CURRENCY POINT

A currency point is equivalent to twenty thousand shillings.

SCHEDULE 2 FORMS Regulations 4(1) and 8 APPLICATION FOR REGISTRATION OF VERIFIER New application Renewal of certificate

Section analysis Source-linked statutory analysis Source linked
Approved statute annotation. Statutory quotations are matched to this consolidation and judicial passages are linked to judgments. Check the primary sources alongside this analysis.
What this section does
Mandatory duty

This section imposes mandatory requirements concerning “Transition of climate change mechanism project A climate change mechanism approval granted before the commencement of”.

“these Regulations shall remain valid until the 31st day of December, SCHEDULE 1 Regulation 2”
Primary legislation Source quotation matched
Practical effect

The provision uses mandatory language; the responsible person or institution should be able to demonstrate compliance.

Deterministic editorial synthesis — not a substitute for the statutory text Editorial synthesis approved
Elements or requirements

Operative requirements extracted from the consolidated text.

1
  1. these Regulations shall remain valid until the 31st day of December, SCHEDULE 1 Regulation 2
Judicial interpretation

Express propositions in source-matched passages from judgments citing this section.

0

No judgment in the current Wakilii corpus expressly cites this section. Bare rule-number references are not assigned where the Order cannot be verified.

Related provisions

No express internal or cross-Act reference appears in this section.

Amendment notes

No section-specific amendment note or instrument-level amendment history appears in this consolidation.

Authority status: legislation is primary authority; judgment weight follows the displayed court level and the ratio caveat. Check version history
1. Background Information of Entity

1.1 Name of entity

1.2 Country of operation

1.3 Business areas

1.4 Business address

2. Business Information of Entity

2.1 Business registration number 2.2 Business Certification of registration/incorporation Documentation Attachments Tax clearance certificate

3. Contact Persons Information of Entity

3.1 Name of key contact person

3.2 Position of key contact person 3.3 Phone number of key contact person 3.4 Email address of key contact person

4. Declaration by contact person

I declare that the information provided in this form represents the formal application to the Commissioner for consideration for registration as a Climate Change Mechanism Project Verifier in Uganda and that the information I have provided is true and complete to the best of my knowledge.

Submitted by:

Full name: ______________________________________________

Signature: _______________________________________________

Designation: _____________________________________________

Submission date: _________________________________________

Regulation 5(1) CERTIFICATE OF REGISTRATION OF VERIFIER

Name of verification entity: ……………………….……………....…

Contact person of verification entity …………………………………

Accreditation body of verification entity ………………………….…

Sector/sub-sector/technology of accredited verification entity………. ………………………….……………………….…….…….……...…

Sector/sub-sector/technology certified to validate or verify climate change mechanism project in Uganda Renewable energy Transport Forestry Sustainable cooking Waste management Industry Electricity and heat production Others [Specify…………………………………………..…]

Validity period: Issued from …………………. to…………...………

Issued by: Commissioner……………………………………………

Signature of Commissioner………………………………………….

Date of issue ………………………………………………………

Seal or stamp

Regulation 9(1) REQUEST TO PARTICIPATE IN CLIMATE CHANGE MECHANISM

1. Name ……………………………………………………...……

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Postal address: …………………………………………....……

The text of this section isn't in the consolidation we hold — see the original PDF above.

3. District or City: ………………………………………....………

The text of this section isn't in the consolidation we hold — see the original PDF above.

4. Street or road name: …………………………………....………

The text of this section isn't in the consolidation we hold — see the original PDF above.

5. GPS Location: ……………………………………....…………

The text of this section isn't in the consolidation we hold — see the original PDF above.

6. Proposed project information
(a)

Location of project …………………………....…………. (b) Proposed technology to be used ……………...…………. (c) Sector …………………………………………....………. (d) Purpose of project- (tick appropriate answer) (i) international transfer for use towards the National Determined Contributions of the Paris Agreement; (ii) international mitigation purposes; (iii) other international mitigation purpose as determined by the participating parties; (iv) mitigation contribution units; or (v) Other purpose (elaborate) ……………….....……

Submitted by ………....................……………………………………

Regulation 9(3) (a) PROJECT IDEA NOTE

Section A (For official use only)

A1 Date of submission …………………………................................…

A2 Project Idea Note file number…………………………….............… Section B (To be completed by the Project Proponent)

B1 Name of project proponent Sector(s) in Agriculture, Forestry and other land use which mitigation (AFOLU) activity is to be undertaken: Energy

Transport Waste

Industrial processes and products use Targeted Article 6.2 Climate Change Mechanism Article 6.4 Voluntary Carbon Market

Location of interest (District, subcounty)

B2 Summary of proposed mitigation activity

B3 Introduction (Provide information on the following: Brief description on the project proponent; proponent's legal status including country of registration; proponent's expertise and experience in the subject area; also provide information related to the project developer. Provide information on work already undertaken in relation to the project outlined in this PIN document including interactions with government agencies or local authorities.) (Max 500 words) B4 Objectives (Outline the objective(s) of the proposed project) (Max 300 words)

B5 Description of mitigation activity, technology and approximate greenhouse gas emissions reduction or removal (Outline the mitigation activity and the proposed approach to activity implementation. Include lifespan of the project, estimated crediting period and permanence period. Provide a description of the proposed mitigation technology including how it abates greenhouse gas emissions and why it is most appropriate for the proposed area, entity or activity. Provide an estimate of the greenhouse gas abatement potential in tonnes of CO2eq.) (Max 1500 words)

B6 Linkage with Uganda's Nationally Determined Contribution, Low Emission Development Strategy, National Climate Policy and relevant sector policies (Provide a description of how the intended project supports the implementation of Uganda's Nationally Determined Contribution, the Low Emission Development Strategy. (Max 500 words)

B7 Contribution to Sustainable Development (Indicate the proposed project's envisaged contribution to social, environmental and economic sustainability using the sustainable development. (Max 500 words)

B8 Proposed project governance and financial arrangements

(Provide information on the proposed governance structure for the project and how it links with existing structures in the sector, shareholding structure, partnerships, and financial arrangements) (Max 500 words)

B9 Work plan towards the submission of the Project Design Document

(Briefly outline the proposed activities, timeframe and milestones towards the submission of a Project Design Document to the Authority. (Max 1000 words)

B10 Measures to ensure stakeholder engagement, public participation, awareness and prior informed consent. (Outline proposed engagement and feedback methods. Also state the proposed principal government department or agency that will be part of the stakeholder engagement, public participation, awareness and prior informed consent activities) (Max 500 words) B11 Documentation indicating adherence to Registration registration. information (Tick the boxes for documents provided and attach relevant documents as evidence) Tax Clearance Agreement between local and international partner Other (Please specify) Information on project proponent Name of project proponent: Name of project proponent representative: Date: Signature: Email address: Telephone number:

Note: For sections B 3 - B11 attach the requirements and mark them as annexures.

Regulation 11 LETTER OF NO OBJECTION

The Ministry acknowledges receipt of Project Idea Note on ___________________ [name of project] being developed by __________________________ [name of project proponent] and located at _______________in Uganda for the period ________________.

The ______________ [name of project] seeks to create emission reduction units under these Regulations from ____________________.

This Letter of No Objection is NOT the same as an approval of the Climate Change Mechanism Project for the ___________________ [name of project] and thus ____________________[name of project proponent] may proceed to prepare the Project Design Document (PDD) for the ___________________ [name of project] accordance with the project development steps prescribed in the Regulations.

Note that in developing the PDD for the __________________ [name of the project], you will be required to show evidence of your engagement with key stakeholders.

You may contact the Ministry on _____________________ [email and phone number] for any further explanations.

_______________________________________________________ Minister, Ministry of Water and Environment

Regulation 15(1) NOTIFICATION OF PROGRESS FORM

1. Information on Project Proponent

1.1 Name of Project Proponent

1.2 Contact of Proponent

1.3 Business address

1.4 Letter of No Objection Reference Number

2. Project Information

2.1 Title of Project

2.2 Description of Project

2.2 Location of Project

2.3 Project category

3. Status of Project Proponent Activities

3.1 Activities Status (Initiated, carried out or completed)

4. Declaration by contact person

I hereby declare that the information provided for notification of progress to the Minister is true and complete to the best of my knowledge.

Submitted by;

Full aame:…………………………………………….

Designation:……………………………………………

Signature:………………………………………………

Submission date:………………………………………

Regulation 17 APPLICATION FOR APPROVAL CLIMATE CHANGE MECHANISMS PROJECT APPROVAL

Part 1

Part 2

1. General information

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Transferring country

The text of this section isn't in the consolidation we hold — see the original PDF above.

3. Managing entity in transferring country

The text of this section isn't in the consolidation we hold — see the original PDF above.

4. Receiving country

The text of this section isn't in the consolidation we hold — see the original PDF above.

5. Entity in receiving country

The text of this section isn't in the consolidation we hold — see the original PDF above.

6. Mitigation activity name

The text of this section isn't in the consolidation we hold — see the original PDF above.

7. Sector

The text of this section isn't in the consolidation we hold — see the original PDF above.

8. Mitigation rationale

The text of this section isn't in the consolidation we hold — see the original PDF above.

9. Summary of mitigation activity

The text of this section isn't in the consolidation we hold — see the original PDF above.

10. Geographical coverage

The text of this section isn't in the consolidation we hold — see the original PDF above.

11. Date and place

The text of this section isn't in the consolidation we hold — see the original PDF above.

12. Document version

B. Methodology Discuss against the scenario the emissions reduction of the project will be credited. Baseline for determination of emissions reduction (a) Autonomous development ("business as usual"): Describe the emissions scenario in the absence of the project under autonomous development. Use conservative assumptions to project technology diffusion. (b) Effect of existing and/or planned policies and measures in line with the National Determined Contributions: Complement the above considerations on autonomous development with the expected effect of existing and/or planned policies and measures for National Determined Contributions implementation. Consider the timeline for policy implementation and use conservative assumptions to not underestimate their effect.

(c)

Crediting baseline: Based on the above considerations on autonomous development and policy effects, describe the emissions scenario against which the emission reductions of the project shall be credited (crediting baseline). It should consider factors for incentivising enhanced climate action in Uganda, i.e., the need for raising ambition along the National Determined Contributions cycle and for a LEDS consistent with the global goal of net-zero emissions by 2050. Crediting Period (Indicate the credit period of the proposed project and how it is linked to the National Determined Contributions implementation period of Uganda) C. Technology scope and demonstration of additionality Describe the technology behind the project and how it will work to lead emissions reduction within the project boundary.

D. Preventing Double Claiming of Finance (Declare the potential overlaps and interactions over time with climate finance, governmental support and other sources of finance attributed to emissions reduction).

(Describe how the activity is promoting sustainable development. The following aspects shall be addressed- (a) Consistency with the SDG priorities of the transferring country. (b) Compliance with environmental and social requirements and standards as framed in applicable policies and frameworks of the transferring country. (c) Respect for human rights. (d) Avoidance of corruption and bad governance. (e) Indicators of sustainable development.

(f)

Stakeholder engagement: Identification of and consultations with stakeholders. What partnerships or legal means is in place to ensure the fundamental rights of the stakeholders? (g) Exit strategy: Explain, if applicable, to what extent the activity is expected to transition to a self-sustaining mode after emissions reduction units revenue ceases

E. Determination, monitoring, and reporting of mitigation outcomes Describe the detailed procedures for determining the mitigation outcomes for which ITMOs shall be created. Describe how the mitigation outcomes will be monitored and reported. (a) Quantification of mitigation outcomes: Describe how the emission reductions are determined relative to the crediting baseline. List the parameters defined ex-ante as well as those measured. Provide reference if a known methodology is used per international standards. (b) Carbon Leakage: Discuss, if appropriate, the avoidance of carbon leakage and the permanence of emissions reduction achieved. (c) Data acquisition: Describe the acquisition of data used to calculate emissions reduction units. F. Institutional Arrangement Project Implementation Arrangement (a) Describe the governance structure of the project, including roles and responsibilities, management structures, and operational processes. Describe the lead institutions and participants involved in the Project. (b) State names and roles of key participants and their designated representatives concerning the revision of this PDD, etc.

(c)

Describe the benefit-sharing mechanism with which Uganda imposes a share of proceeds to compensate implementation costs and fund a separate fund. Discuss the level of share of proceeds needed and the impact on the business model and pricing. Interaction with transferring country (in case authorisation is required for international transfer of emissions reduction units) (a) Describe the coordination structure and interaction between the project and competent authorities of the transferring country. (b) Propose what national coordinating structures (e.g., inter- ministerial, cross-sectoral) established to ensure proper interaction between the transferring country and the project. G. Financing Arrangement for implementing the proposed project (Elaborate on the financial model for the project and how the emissions reduction units revenue will contribute to making the project viable). H. Implementation plan for the proposed project I. Interactions with receiving entity

Regulation 18 BENEFITS-SHARING PLAN (1) Description of project ……………………………………………………………..………… ………………………………………………………………..………

(2)

Description of stakeholder consultations and expectations ……………………………………………………………..………… ………………………………………………………………..………

(3)

List of beneficiaries ……………………………………………………………..………… ………………………………………………………………..………

(4)

Description of benefits ……………………………………………………………..………… ………………………………………………………………..………

(5)

Description of benefits distribution ……………………………………………………………..………… ………………………………………………………………..………

(6)

Description of monitoring approach ……………………………………………………………..………… ………………………………………………………………..……… (7) Communication approach ……………………………………………………………..………… ………………………………………………………………..………

Regulation 19(2) SUSTAINABLE DEVELOPMENT CRITERIA

The criterion comprises environmental, social, economic, and technological elements and monitoring indicators. The elements are subdivided into sub-elements. Project proponents are expected to provide baselines for each sub-element and a monitoring plan Aspect Criteria Maximum Score Certificate of approval of the Environmental Social Impact Assessment (ESIA) by the National Environment Management Authority Environmental (NEMA) where applicable (If not applicable present a letter of exemption from NEMA).

A. Social 40

1. Enhancing community access

to essential social services for example; energy, safe water 10 and hygiene, communication, health, education, and clean air, among others. Social 2. Community engagement and participation in project 7 implementation, monitoring, and evaluation

3. Gender balance and participation

5 of disadvantaged groups.

4. Cultural heritage.

The text of this section isn't in the consolidation we hold — see the original PDF above.

5. Land ownership.

The text of this section isn't in the consolidation we hold — see the original PDF above.

6. Health and safety.

The text of this section isn't in the consolidation we hold — see the original PDF above.

7. Indigenous people where

applicable. 3

B. Economic 35

1. Contribution to employment

generation 8

2. Contribution to saving and

generation of foreign exchange. 7

3. Contribution to increased

production of marketable goods 6 Economic and services

4. Mutual economic benefits

accruing from project activities 5

5. Contribution to increased

demand for services 5

6. Contribution to redistribution

of development to address area 4 imbalances in development. C. Technology 25

1. Environmentally friendly

technologies 10

2. Technology transfer (hard and

Technology software) 7

3. Efficiency of technologies

The text of this section isn't in the consolidation we hold — see the original PDF above.

4. Acceptability of technology by

local community. 4

Total Score 100

Regulation 20(1) APPROVAL OF CLIMATE CHANGE MECHANISM PROJECT

Date of issue: ……………. Approval No: ……………. Name of project proponent: ………………………………………… Name of project: …………………………………….……………… Address: …………………………………………….......……………

You are hereby approved to carry out ……………………… [name of project] in …………………… [location], Uganda.

This approval is valid from …………20…………to…………20…… Conditions: (a) This Approval is NOT THE SAME as the Letter of Authorisation, which is required before the international transfer of emissions reduction units for use towards the nationally determined contribution of an acquiring entity or for international mitigation purposes or overall mitigation of global emissions or mitigation contribution claims. (b) All emissions reduction units generated from the project implementation that will be authorised for international transfer shall be used within the implementation period of Uganda's nationally determined contribution. (c) The implementation of the project shall comply with the required environmental integrity, sustainable development, monitoring and safeguarding (safety, social and environmental) requirements in the PDD and validation report. (d) Submission of annual monitoring reports to the Department on the progress of implementation and achievement of the project.

__________________________ MINISTER OF WATER AND ENVIRONMENT

Regulation 24 PROJECT PROGRESS REPORT

1. Title of project

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Department reference

number of Project

3. Version number of the

PDD is applicable to this monitoring report.

4. Version number of this

monitoring report

5. Completion date of this

monitoring report

6. Duration of this monitoring

period

7. Project owner

The text of this section isn't in the consolidation we hold — see the original PDF above.

8. Transferring participating

party

9. Acquiring participating

party

10. Applied methodologies and standardised baselines

The text of this section isn't in the consolidation we hold — see the original PDF above.

11. Sectoral scope

The text of this section isn't in the consolidation we hold — see the original PDF above.

12. Project activities implemented in the monitoring period

The text of this section isn't in the consolidation we hold — see the original PDF above.

13. Amount of GHG Amount Amount Amount

emissions reduction or achieved achieved achieved net anthropogenic GHG before from from removals achieved by the period 1 period 1 period 2 mitigation activity in this monitoring period.

14. Amount of GHG

emissions reduction or net anthropogenic GHG removals estimated for this monitoring period in the PDD.

Date:……………………………………..

Contact person:…………………………

Signature:………………………………

Regulation 26 NOTIFICATION OF VOLUNTARY CANCELLATION OF PROJECT

1. Name of project proponent: …………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Name of project: ……………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

3. Postal address: ………………………………………………………
(a)

District or City: …………………………………………... (b) Street or road name: …………………………………………… (d) GPS Location: ……………………….……………………….

4. Details of Contact person
(a)

Name: ………………………………………………………… (b) Contact details: ……………………………………………….

5. Approval number: ………………………………………….………

The text of this section isn't in the consolidation we hold — see the original PDF above.

6. Date of issuance of approval: ……………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

7. Date of expiry of the approval: ……………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

8. Date of notification of cessation of activities: …………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

9. Reason for cessation of activities ………………………………………………………………………

………………………………………………………………………

10. Activities prior to cessation ……………………………………………………………………… ………………………………………………………………………

Submitted by ……………………………………… Regulation 36(1) REPORT OF DOMESTIC TRANSFER OF VERIFIED EMISSIONS REDUCTION UNITS

1. Project Information
(a)

Name of project proponent (b) Name of project (c) Location of project (d) Implementation period of project (e) Expected emissions reduction units (f) Validation status of project (g) Approval status of project (h) Monitoring period (i) Verified emissions reduction units issued (j) Name International Crediting Standard (ICS) Registry includes a unique identifier.

2. Issuance
(a)

Reference of project proponent on ICS registry (b) Reference of project on registry (c) Emissions reduction units issued in tonnes units: (d) Emissions reduction units issued with serial number units: (e) Emissions reduction units use labels on the registry

(f)

Date of issuance of emissions reduction units on registry

3. Domestic Transfer
(a)

Emissions reduction units transfer occurred. (b) Reference of transaction (c) Transaction date (d) Reference of originating registry (e) Name and address of transferee (f) Reference of receiving registry (g) Emissions reduction units transferred (h) Stated purpose of domestic transfer (i) Use cases of domestic transfer. (j) Transactions actions (k) Date of transaction (l) Notification of completion of the transfer (m) Notification of recognition of transfer (n) Quantity of emissions reduction units cancelled or retired. Transaction Report submitted by: Stamp ..…………………………………………… Name:……………………………………… Project Proponent:…………………………. Date:……………………………………… Signature:………………………………….

Regulation 37(1) REQUEST FOR AUTHORISATION OF INTERNATIONAL TRANSFER OF VERIFIED EMISSIONS REDUCTION UNITS

1. Name of project proponent ……………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Name of project …………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

3. Technology/component used in project …………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

4. Sector ……………………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

5. Location of project ……………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

6. Purpose of transfer………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

7. Amount of emissions reduction units to be transferred …………

The text of this section isn't in the consolidation we hold — see the original PDF above.

8. Name of acquiring participating party ……………………………

Attachments Proof of ownership; Proof of registration of the verified emissions reduction units; To whom the transfer is being made; Intended use of the verified emissions reduction units by the transferee; Amount of verified emissions reduction units being transferred; Evidence of payment of prescribed fee.

Submitted by ………………………………………………………….

Regulation 37(4) AUTHORISATION FOR TRANSFER OF CERTIFIED EMISSIONS REDUCTION UNITS FOR INTERNATIONAL TRANSFER

Date of issue of authorisation……… Authorisation No. ………………….. Name of project proponent :…………………………………………… Name of project: ……………………………………………………… Address: ……………………………………………………………… You are hereby authorised to transfer ………………. (amount of emissions reduction units) to ……………………. I wish to confirm the following:

1. Uganda ratified the Paris Agreement on

21st September 2016 and submitted its latest National Determined Contributions to the National Determined Contributions registry in accordance with Article 4, paragraph 12 of the Paris Agreement on 12th September, 2022

2. Uganda's participation in the cooperative approaches

is referred to in Article 6, paragraph 2, of the Paris Agreement on a voluntary basis

3. This letter constitutes Uganda's authorisation, as

defined per the guidance on cooperative approaches referred to in Article 6, paragraph 2, of the Paris Agreement (Decision 2/CMA.3) with the following

(a)

Verified emissions reduction units generated from the approved project in Uganda in respect of, or representing emissions reduction from 2021 onwards.

(b)

The Government of Uganda will not use the emissions reduction units generated from the authorised project to demonstrate the achievement of its own National Determined Contributions. (c) The verified emissions reduction units issued in a recognised registry and the transfer and use are consistent with the guidance and relevant decisions of the CMA. (d) Amount of certified emissions reduction units to be transferred

4. Through this authorisation

the Government of Uganda commits to apply corresponding adjustments consistently with the guidance on cooperative approaches referred to in Article 6, paragraph 2, of the Paris Agreement (Decision 2/CMA.3) and relevant future decisions of the CMA, in a transparent, accurate, complete, comparable and consistent manner

5. The authorisation shall be applicable until the authorisation lapses unless

there are an unforeseeable circumstance that prevents Uganda or the project proponent or participating acquiring Party from fulfilling the terms and condition of the letter

6. For achieving higher mitigation ambition over

the crediting period, this letter may be modified through an addendum to the original letter to allow upscaling the scope and target of the project _______________________________________________ MINISTER OF WATER AND ENVIRONMENT

Regulation 41 NOTIFICATION OF CHANGE IN PROJECT INFORMATION

1. Name of project proponent……………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

2. Name of project ………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

3. Technology/component ………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

4. Sector …………………………………………………………

The text of this section isn't in the consolidation we hold — see the original PDF above.

5. Location ……………………………………………………

Indicate change in the following project information.

Type of project Existing details New or updated information details

Submitted by: ……………………………. Name of project proponent:……………………………………….

SCHEDULE 3 Regulations 4(2)(b),9(3) and 37(5) FEES

Fee Type Category Fees (UGX)

1. Application for Project Proponent 2,000,000/=

approval of climate change mechanism

2. Corresponding Project proponent 10% of each

Adjustment (CA) fee ITMO (CA fee/ ITMO)

3. Registration of Verifiers 6,000,000/=

verifier

4. Inspection of Interested persons 3,000,000/=

Register

SAM MANGUSHO CHEPTORIS, Minister of Water and Environment.

Original Laws of Uganda consolidation (as at 24 January 2025) — public-domain legislation, consolidated by ULII / Laws.Africa (CC BY 4.0). This is a point-in-time text and may not reflect later amendments; confirm against the latest Uganda Gazette before relying on it.